We are going to renew the network switches and application servers of RCNP in the period from late June to early August. During this period, the network connections as well as most network services (such as mail, www, VPN, and network management system) of RCNP will stop intermittently. Please take a look at and check carefully the renewal schedule below, which will be frequently updated.
The application servers that are renewed are:
The versions of software packages installed in the WWW and DB servers are updated. Below we list several critical packages that could cause problems in user's web and DB contents. Please check whether or not softwares/apps used for your web pages are compatible with the updated packages listed in the following tables, and update your softwares/apps appropriately if you find them incompatible.
WWW service:
Current System | New System | |
Apache | 2.2.15 | 2.4.6 |
Perl | 5.10.1 | 5.16.3 |
PHP | 5.3.3 | 5.4.16 |
Python | 2.6.6 | 2.7.5 |
Ruby | 1.8.7 | 2.0.0 |
DB service:
Current System | New System | |
MySQL/MariaDB | 5.5.37(MySQL) | 5.5.60(MariaDB) |
PostgreSQL | 9.2.7 | 9.2.24 |
cp -pdR pukiwiki/ pukiwiki-backup/
cd pukiwiki/ patch -p1 < /(Path to the directory where patch downloaded)/update_pukiwiki_147to150_XXX.patch
The new RCNP VPN service allows you VPN access not only from Windows, Mac, and Linux Operating Systems as before, but also from iOS and Android devices. The detailed instructions for the usage of the new VPN service can be found here.
The operation of SYSTEM B is discontinued. Only SYSTEM A (https://www.rcnp.osaka-u.ac.jp/netmanage1/) is available for the service.
Last Update: August 17, 2019 (Schedule is subject to change.)
Date | Time | Description |
June 28 (Fri.) | 10:00-12:00 13:00-15:00 |
COMPLETED Replacement of the VPN servers.
|
July 1 (Mon.) | 9:00-12:00 | COMPLETED Replacement of network core switch in the AVF Network Room (CORE-A1).
|
July 1 (Mon.) | 13:00-17:00 | COMPLETED Replacement of network core switch in the Honkan Network Room (CORE-H1).
|
July 2 (Tue.) | 9:00-12:00 | COMPLETED Replacement of network core switch on B1F of the Ring Experiment building (CORE-RB).
|
July 2 (Tue.) | 13:00-15:00 | COMPLETED Replacement of network core switch in the West Experiment Room of the Ring Experiment building (CORE-RWB).
|
July 2 (Tue.) | 15:00-17:00 | COMPLETED Replacement of network switch in the RCNP Guest House (SW-G116).
|
July 3 (Wed.) | 9:00-13:00 | COMPLETED Replacement of network core switch in the IT Core Annex of the Cybermedia Center (CORE-IT).
|
July 4 (Thu.) | 9:00-13:00 | COMPLETED Replacement of network core switch in the Ring Network Room (CORE-R2).
|
July 5 (Fri.) | 9:30-11:00 | COMPLETED Applying 10G ports to network core switch in the AVF Network Room (CORE-A1).
|
July 5 (Fri.) | 11:00-12:30 | COMPLETED Applying 10G ports to network core switch in the Honkan Network Room (CORE-H1).
|
July 11 (Thu.) | 10:00- (Until July 16 12:00) |
COMPLETED The Network Management System stops.
|
July 15 (Mon.) | 9:00-18:30 | COMPLETED Replacement of the application servers (such as
Replacement of the SMTP, IMAP4, and WWW servers is postponed until August 3 or later. (The mail and www services of RCNP still stop on July 15 even though the replacement of the SMTP, IMAP4, and WWW servers is postponed.) |
July 16 (Tue.) | 9:00-12:00 | COMPLETED Replacement of the Network Management System
|
July 29 (Mon.) | 9:00-13:00, 14:00-17:30 | COMPLETED Replacement of the firewall.
|
August 3 (Sat.) | 10:00 - 18:00 | COMPLETED Migration of the mail data and replacement of the mail (SMTP and IMAP4) servers.
|
August 3 (Sat.) | 15:00- (Until August 4 12:00 (noon)) |
POSTPONED Migration of the web contents data and replacement of the WWW server.
|
August 16 (Fri.) | 18:00- (Until August 17 13:00) |
COMPLETED Migration of the web contents data and replacement of the WWW server.
|
If you have any questions on the renewal, please contact the RCNP CN Group at consult@rcnp.osaka-u.ac.jp.