Grand Raiden memo

Preparation

A/C

VDCs

Viewers

Cameras

FCs

Vacuum chambers and valves

Targets

Plastic scintillators at GR FP

Magnets

Detectors

Log book

DAQ

Tuning procedure

  1. Beam transportation
  2. Beam transmission > 90%
    • BS3 - FCs at beam dump
  3. Start up GR
    1. Plastic scintillators
      1. ADC raw 1d
      2. TDC raw 1d
      3. Correlation between ADC L & R
      4. GR-GV is open or not? Push button sometimes. Looks OK. Hardware things.
      5. Inside of GR chamber? D1-FC is blocking the beam?
      6. Q1-FC is blocking the beam?
    2. RF signals
      1. Raw data is OK?
      2. Channels assignment are OK?
    3. Blocking stuff?
    4. Installing the alminum plate
    5. VDC wire check by continuum
    6. Plastic scintillators HV optimization
    7. VDC HV optimization
    8. Energy calibration by the C target
      • Check if the nuclide of the primary beam is correct or not
      • Coefficient for MeV/mm
      • By the way, SH5 is a momentum slit
    9. Optimization of beam energy resolution with the Au target (achromatic mode)
      1. macro – resmon?
      2. GXTHC
      3. GXCTH
      4. GTHCTH
      5. GX gate
      6. See the histogram list in GR optics
      7. The goal is 80 keV (FWHM) for proton 295 MeV
      8. Au target has some excited states at low energy. This looks a child of the beam?
    10. Changing the beam line setting takes time longer than 30 minutes (Nebiki-san & Furutaka-san)
      1. 50 minutes on Dec. 5, 2017 by Nebiki-san & Furutaka-san
    11. Optimization of beam energy resolution with the Au target (dispersion matching mode)
      1. This optimization should be done after the tuning for achromatic mode
      2. The goal is 20-30 keV (FWHM) with a target for proton 295 MeV (the best value is 14 keV (FWHM))
      3. The goal is 15 keV (FWHM) without a target for proton faint beam at 295 MeV
      4. Change the GR angle from 8.5 degree to 0 degree
      5. SC-FC is down
      6. Faint beam
      7. The beam is centered (0 mm) in GX
      8. Check the resolution (30 keV (FWHM) at GX of 0 mm, 25 keV (FWHM) at GX of -400 mm at E377 and E422 on Dec. 5, 2017)
      9. Y focus by changing the QM10 with Au target
      10. Target Au –> blank
      11. QM10UDD optimization - First UD-M table which can realize good Y focus should be made
        1. UD (A) / M (A) / dE (keV)
        2. 25.50 / -41.20 / 31 keV
        3. 25.70 / -41.41 / keV
        4. 25.90 / -41.41 / keV
        5. 26.10 / -41.41 / keV
  1. Q1-magnet focusing with the sieve slit and the carbon target
  2. Q1-magnet defocus with the sieve slit and the carbon target

Restrictions

E404

After experiments

Modes

Beam time

Dispersion matching

Resolutions

For 12C beam at 250 MeV (E404, Tsumura-san's exp)

GR DAQ

* The web controller is a set of a server side and client side programs

* vmeserver:8080 –> Tomcat server is working

Memos