Grand Raiden memo
Preparation
VDCs
- Check if gas is flowing or not
- Check if the preamps are turned on or not
- Check if the fans are turned on or not
Viewers
- Check if the viewers can move correctly or not
- Target viewer
- Q1-FC viewer
- FPS viewer
- 0-deg. dump viwer
- 0-deg. Tami-Q viwer
Cameras
- Check the image from the console
- Target viewer
- Q1-FC viewer
- FPS viewer
- 0-deg. dump viwer
- 0-deg. Tami-Q viwer
FCs
- Check if the FCs have a correct connection or not by tester
- Check if the FCs have a correct isolation or not by 1000V insulation tester
- Q1-FC
- FC at 0-deg. dump
- FC at FPS
- Check if the FC is connected to current integrator
Vacuum chambers and valves
- Check if all chambers do not have leak or not
- The pressure should be less than about 1*10^-2 Pa
- Check if all gate valves are open or not
Targets
- Check if target ladder can move correctly or not
Plastic scintillators at GR FP
- Check if the signals are OK or not by oscilloscope
- The model of PMTs is H7195. The voltage limit is -2700V.
Magnets
- Check if all magnets can be excited or not
Detectors
- Energy calibrations
Log book
- The log book should be prepared during beam tuning
DAQ
- Setup and initialization for each experiment
http://www.rcnp.osaka-u.ac.jp/Divisions/np1-a/pukiwiki/index.php?Setting%20up%20the%20CAGRA%2BGR%20DAQ - Check if the daq can run or not by using pulser
- Check if the disk space is enough or not
Tuning procedure
- Beam transportation
- Beam transmission > 90%
- BS3 - FCs at beam dump
- Start up GR
- Plastic scintillators
- ADC raw 1d
- TDC raw 1d
- Correlation between ADC L & R
- GR-GV is open or not? Push button sometimes. Looks OK. Hardware things.
- Inside of GR chamber? D1-FC is blocking the beam?
- Q1-FC is blocking the beam?
- RF signals
- Raw data is OK?
- Channels assignment are OK?
- Blocking stuff?
- Installing the alminum plate
- VDC wire check by continuum
- Plastic scintillators HV optimization
- VDC HV optimization
- Energy calibration by the C target
- Check if the nuclide of the primary beam is correct or not
- Coefficient for MeV/mm
- By the way, SH5 is a momentum slit
- Optimization of beam energy resolution with the Au target (achromatic mode)
- macro – resmon?
- GXTHC
- GXCTH
- GTHCTH
- GX gate
- See the histogram list in GR optics
- The goal is 80 keV (FWHM) for proton 295 MeV
- Au target has some excited states at low energy. This looks a child of the beam?
- Changing the beam line setting takes time longer than 30 minutes (Nebiki-san & Furutaka-san)
- 50 minutes on Dec. 5, 2017 by Nebiki-san & Furutaka-san
- Optimization of beam energy resolution with the Au target (dispersion matching mode)
- This optimization should be done after the tuning for achromatic mode
- The goal is 20-30 keV (FWHM) with a target for proton 295 MeV (the best value is 14 keV (FWHM))
- The goal is 15 keV (FWHM) without a target for proton faint beam at 295 MeV
- Change the GR angle from 8.5 degree to 0 degree
- SC FC is down
- Faint beam
- The beam is centered (0 mm) in GX
- Check the resolution (30 keV (FWHM) at GX of 0 mm, 25 keV (FWHM) at GX of -400 mm at E377 and E422 on Dec. 5, 2017)
- Y focus by changing the QM10 with Au target
- Target Au –> blank
- Q1-magnet focusing with the sieve slit and the carbon target
- Q1-magnet defocus with the sieve slit and the carbon target
E404
- Beam transportation
- Transmission check
- HV and threshold tuning of plastics
- HV tuning of VDCs
After experiments
- If no one (magnet at N0 nor EN?) is using the power of the magnets, we can turn off the main switch of the power.
- We do not have to stop the cooling water.
Modes
- 0-deg. DSR+ mode
- 0-deg. (p, p') dump mode
- 0-deg. (alpha, alpha') mode
Beam time
- 1.5-2 days for a single target and a single angle setting
- 1 week for polarized beam for a single target and a single angle setting
Dispersion matching
- Changing beam line setting from achromatic mode: 1 - 2 hours
- Dispersion matching tuning : 6 hours
- In total 9 hours or something
Resolutions
- Achromatic mode
- p 300 MeV : 60-100 keV
- 12C 1200 MeV : 240 - 400 keV
For 12C beam at 250 MeV (E404, Tsumura-san's exp)
- VDCs
- HV (initial values): CATH: -4.55kV, POT: -0.30 kV
- HV (optimized values): CATH: -4.40kV, POT: -0.35 kV
GR DAQ
* The web controller is a set of a server side and client side programs
- If you change the program, we have to restart the web browser in order to erase the cash in the browser
* vmeserver:8080 –> Tomcat server is working
- Account: quser
- Password: please ask me
Memos
- Always flow the cooling water on the magnets of GR and LAS
- Keep the GR and LAS chambers vacuum
- isobutane is used also by EN (but GR- and LAS-VDCs are the main users)
E483
- VDC threshold 4 uA –> 20 uA (sometimes 40 uA is used for 0 deg. exp.)