Warning: include(lib/Develop_2023.php): failed to open stream: No such file or directory in /var/www/html/Divisions/np1-c/DBD/Public/lib/Public_Main.php on line 25 Warning: include(): Failed opening 'lib/Develop_2023.php' for inclusion (include_path='.:/usr/share/pear:/usr/share/php') in /var/www/html/Divisions/np1-c/DBD/Public/lib/Public_Main.php on line 25

FY2022

FY2021

FY2020

FY2019

FY2017

FY2014

24 Mar. 2015  Finishing of the construction of the sheilding system(for the side of the main tank)

06 Mar. 2015  Start of the constraction of the sheilding system(for the side of the main tank)

24 Dec. 2014  Stop of the operation of the cooling system in CANDLES

24 Oct. 2014  Start of the operation of the cooling system in CANDLES

FY2012

28 May 2012  Re-start of the measurement with CANDLES